Always important is the work and preparation before the actual construction. I’ve done the photo shoots and research for the rendering. Now its time to prim 13 panels of MDO wood. Each panel is 4 feet wide and 7 feet tall, so i am working some good stabilizing arm muscles when I move these….all in the name of art…

I am priming all six sides with outdoor primer, then will also seal 5 sides with waterproof sealant. Once the mural is finalized and secured to the wall, it will be sealed with a waterproof/uv sealant, which will be reapplied every 4-6 years.