Prep Work

Always important is the work and preparation before the actual construction. I’ve done the photo shoots and research for the rendering. Now its time to prim 13 panels of MDO wood. Each panel is 4 feet wide and 7 feet tall, so i am working some good stabilizing arm muscles when I move these….all in the name of art…

I am priming all six sides with outdoor primer, then will also seal 5 sides with waterproof sealant. Once the mural is finalized and secured to the wall, it will be sealed with a waterproof/uv sealant, which will be reapplied every 4-6 years.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.